• 美国贸易保护主义致世界经济蒙阴影 2019-06-15
  • 西方艺术史中那一抹鲜艳的红 2019-06-15
  • 江西应用科技学院成立人工智能学院,民办高校加速人才布局 2019-06-09
  • 汝已经哑口无言,只剩下两声尴尬的干笑了。[哈哈] 2019-06-08
  • 淮北日报社党委书记、社长张士锋祝贺人民日报创刊70周年 2019-06-07
  • 中国现在大学毕业水平人口有近一亿,20年后是3.5亿,比美国总人口还多,硕士生将达到2千5百万,博士2百万。这就是20年后中国的实力,不管美国怎样折腾都是没用的 2019-06-07
  • 四川雅江:消防战士扑灭山火后  录视频给父母拜年 2019-06-06
  • 高级需求不是物质需求,而是精神需求。你可能理解不了,为什么方志敏们面对高官,厚禄的诱惑而其志不改。 2019-06-05
  • 用餐遇收取包厢费、开瓶费、餐具消毒费等请举报 2019-06-05
  • CAMEL骆驼品牌简介文章中国国家地理网 2019-06-04
  • 【砥砺奋进六十年·全国主流媒体宁夏行】非遗文化技艺助农民脱贫 2019-06-03
  • 毒贩冲卡疯狂逃窜  民警鸣枪示警一网打尽 2019-06-02
  • 波罗木刻:一把刻刀 点木成“金” 2019-06-02
  • 他们不知道,年轻人轻轻松松也能就业 2019-06-01
  • 推进“安康杯”竞赛广泛深入持久开展 汇聚职工群众参与安全生产的强大合力 2019-05-31
  • search
    FUWEI
    Contact information

    TEL:18118260587

    EMAIL:[email protected]

    ADD:Storage battery industry park, Gaoyou Economic Development Zone, Yangzhou, Jiangsu

    News Center

    白小姐急旋风彩图132期:The wind power project is expanding in an all-round way, with the rapid development of electric power and the promotion of electric heating

    Release:admina Browse:918 times

    白小姐职业装 www.eetbg.tw Fullwell battery can network news: with the National Energy Board issued the "notice" on further improving the management of annual wind power development plan, arrangement of wind power project construction of new or abandoned wind power rationing ratio of more than 20% of the area. This is a response to a record high of 18% in the first quarter, the average wind power rejection rate, and the national policy level.

    Recently announced "12th Five-Year" plan, the fifth batch of wind power project approval plan has indicated that a large number of new wind power projects will soon be launched. The plan shows that the newly approved wind power project reached 34 million kilowatts, will hit a 25% growth rate, the growth rate for the calendar batch of the highest. The last four approved projects did not exceed 28 million kW or 34 million KW each time.

    Reporters learned that the new projects are mainly concentrated in the low rate of abandoned, but the larger demand in Yunnan, Shandong and other places, but the high rate of abandoned "Three North" region, no incremental projects. At the same time, through the establishment of 20% abandoned wind rate, high voltage lines, quota system, ultra high pressure and other policies, will promote the solution of the phenomenon of abandoning the wind.

    Last year, the installed capacity of wind power has accounted for 7% of the total capacity of China's generators, but the power generated by wind power generation accounts for only 2.78% of the total power generation, the official website of the national energy board said. Insiders pointed out that the existing installed capacity under the condition of wind Haoyuwangnian will increase wind power grid pressure: if the mass of new projects, will cause greater pressure to wind power, the wind power abandoned wind power rationing situation is more serious, so the industry proposal should delay wind power the pace of expansion.

    In this regard, Zhang Shuwei told reporters that his research team showed that even if the existing power grid is completely unchanged, the acceptance of more than 10% of the wind power and 5% of photovoltaic power is no problem. Public information shows that in 2014 the wind power online 153 billion 400 million kwh, accounting for only 2.78% of all power generation, from the capacity of 10%, there is still a big gap. In addition, the "12th Five-Year" plan aims to: by 2020, wind power grid installed capacity will reach 200 million kilowatts. As of the end of March this year, cumulative wind power and network capacity of just over 100 million kilowatts.

    Therefore, he believes that the construction of the wind force is necessary, but in the "feasibility" needs to be improved. In the "feasibility", he pointed out that in the short term, should change the scheduling priority, simulated market bidding behavior, based on local resource endowments, technology and social economy to make optimal choice; in the medium term, the development of wind power is a clear goal, and other basic conditions, including the power grid infrastructure, all need to upgrade to meet the way of the development of wind power; in the long term, the establishment of power market, the establishment of incentive compatible system of wind power development support system.

    According to the national energy administration, the rate of wind rejection was as high as 18% in the first quarter of 2015. Analysis of the energy bureau is: on the one hand, because the wind is better than the same period last year, an objective to increase the connection and consumptive pressure; on the other hand, the national electricity demand is slowing because of wind power shortage in some areas and supporting the local consumptive power grid construction and construction of wind power and other reasons.

    In fact, the rate of 18% abandoned air is 0.8 percentage points higher than the rate of abandonment in 2012 of 17.12%. Therefore, insiders questioned: since the rate of abandoned wind has been so high, why wind power project and expansion of power industry? An unnamed analyst also told reporters, "now has introduced a policy of abandoned wind rate of 20% place no arrangements for new projects, and now abandoned wind power rationing mainly is the northwest and Northeast, but this new batch of major projects in the south that have abandoned wind and demand in place."

    The macro planning and policies of wind power will lead to the improvement of wind power rationing. Specifically, there are four supporting policy measures: region abandoned wind power rationing over 20% proportion does not arrange new projects; renewable energy quota system to be implemented; until 2017 after the completion of UHV, North South transmission can become a reality, the great northern wind power resources can be transported to the south to have their nearest consumptive; digestion, wind power heating to wind resources. Not only that, electricity reform will also help the new energy industry, if the new energy subsidies reduced, such as wind power in 2020 the bidding price and thermal power, wind power and thermal power are better able to compete in the market, to promote wind power consumption. At the same time, it also promotes the development of electric power and other related industries. Among them, electric heating will be one of the most beneficial industries.

    Jiangsu Fuwei copyright statement: all sources to "Jiangsu Fuwei: XXX (signed), any website or units without permission prohibited, use rights reserved. Please contact 0514-84588333 if you need to use it.

    With all this marked "source: XXX (non fullwise battery website)" works are reproduced with other media, aims to disseminate more information, but it does not mean that the battery fullwise website agree with their views or confirm the description, this article is for reference only. If other media needs to be reprinted, please contact the source of the manuscript, such as any problems that have nothing to do with this website.

  • 美国贸易保护主义致世界经济蒙阴影 2019-06-15
  • 西方艺术史中那一抹鲜艳的红 2019-06-15
  • 江西应用科技学院成立人工智能学院,民办高校加速人才布局 2019-06-09
  • 汝已经哑口无言,只剩下两声尴尬的干笑了。[哈哈] 2019-06-08
  • 淮北日报社党委书记、社长张士锋祝贺人民日报创刊70周年 2019-06-07
  • 中国现在大学毕业水平人口有近一亿,20年后是3.5亿,比美国总人口还多,硕士生将达到2千5百万,博士2百万。这就是20年后中国的实力,不管美国怎样折腾都是没用的 2019-06-07
  • 四川雅江:消防战士扑灭山火后  录视频给父母拜年 2019-06-06
  • 高级需求不是物质需求,而是精神需求。你可能理解不了,为什么方志敏们面对高官,厚禄的诱惑而其志不改。 2019-06-05
  • 用餐遇收取包厢费、开瓶费、餐具消毒费等请举报 2019-06-05
  • CAMEL骆驼品牌简介文章中国国家地理网 2019-06-04
  • 【砥砺奋进六十年·全国主流媒体宁夏行】非遗文化技艺助农民脱贫 2019-06-03
  • 毒贩冲卡疯狂逃窜  民警鸣枪示警一网打尽 2019-06-02
  • 波罗木刻:一把刻刀 点木成“金” 2019-06-02
  • 他们不知道,年轻人轻轻松松也能就业 2019-06-01
  • 推进“安康杯”竞赛广泛深入持久开展 汇聚职工群众参与安全生产的强大合力 2019-05-31
  • 里昂vs里尔预测 德甲汉诺威96对沙尔克04 勒沃库森施耐德 剑网3 万花 快乐十分复式玩法 大连实德vs阿尔艾因 波尔多蒙彼利埃 梦幻西游2游戏 重庆时时彩计划_人工版 都灵vsac米兰